[Free] 2018(May) EnsurePass Passguide Microsoft 70-499 Dumps with VCE and PDF 151-160

Ensurepass.com : Ensure you pass the IT Exams
2018 May Microsoft Official New Released 70-499
100% Free Download! 100% Pass Guaranteed!

Recertification for MCSD: Application Lifecycle Management

Question No: 151 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template.

You plan to retest any test cases that have active bugs.

You need to review the requirements associated with the test cases prior to running the tests.

What should you do?

  1. Create a query-based suite in MTM to select the matching test cases. Open each test case and validate the requirement on the Tested User Stories tab.

  2. Use a work item query in Excel to list test cases and their associated requirements details.

  3. Create a direct links query in MTM to select the matching test cases. Open each test case and validate the requirement on the Tested User Stories tab.

  4. In the Test tab in MTM, filter the test cases that have associated bugs. Open each test case and validate the requirement on the Tested User Stories tab.

Answer: C

Question No: 152 – (Topic 2)

You plan to conduct a test for a multi-tier ASP.NET website by using Microsoft Test Manager (MTM). You have created a test plan named Release 1.0.

Under the Release 1.0 test plan, the test run should:

->Collect information about all machines on which the test is run, and

->Collect each UI action performed within the Client role.

You need to configure the Release 1.0 test plan to meet these requirements. What should you do?

  1. Create new test settings for Manual Tests by using the client and server roles. Select the System information and Action log diagnostic data adapters.

  2. Create new test settings for Automated Tests on the local machine. Select the IntelliTrace and Action Log diagnostic data adapters.

  3. Create new test settings for Automated Tests by using the client and server roles. Select

    the ASP.NET profiler and Code coverage diagnostic data adapters.

  4. Create new test settings for Manual Tests on the local computer. Select the System information and Code coverage diagnostic data adapters.

Answer: A

Question No: 153 – (Topic 2)

You are using Microsoft Test Manager (MTM).

You plan to design a shared steps work item with the possibility that it will be used with multiple rows of test data.

You need to create a test case that contains the shared steps in multiple iterations. You also need to provide different test data for each iteration.

What should you do?

  1. Create a copy of the shared steps work item and provide different values for the parameters in the original shared steps work item and its copy. Use the different shared steps work items in the test cases to get different test data.

  2. Create an action recording of the shared steps work item and specify multiple parameter values while recording.

  3. Provide default parameter values in the shared steps work item and provide different data in the test case for multiple iterations.

  4. Provide multiple values for parameters in the shared steps.

Answer: C

Question No: 154 – (Topic 2)

You are using Microsoft Test Manager (MTM). You have developed a new test case.

You need to:

->Set the test case priority,

->Set the area where the test will be used, and

->Update the work item state to Ready.

What should you do?

  1. Open the Test Configuration Manager view and change the area path, priority, and state.

  2. Open the Test Plan Manager view and change the area path, priority, and state.

  3. Open the test case work item and change the area path, priority, and state.

  4. Open the test plan Properties view and change the area path, priority, and state.

Answer: C

Question No: 155 DRAG DROP – (Topic 2)

You are the lead product tester for your company. You use Microsoft Visual Studio Ultimate to design and test your flagship product.

You restructure some of the testing to use shared steps. You need to create an action recording for a shared step.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Explanation:

Ensurepass 2018 PDF and VCE

http://msdn.microsoft.com/en-us/library/vstudio/dd420559(v=vs.110).aspx

Question No: 156 – (Topic 2)

While reviewing a bug in Microsoft Test Manager (MTM), you realize there is no test case covering the bug.

You need to create a test case from the bug, including test steps, and associate it with the test case for future reference.

What should you do?

  1. In MTM, in the Verify Bugs activity, select the bug. Click Open test case.

  2. Open a Visual Studio 2012 window. Select the bug and click Open test case.

  3. In MTM, in the Verify Bugs activity, select the bug. Click Create test case from bug.

  4. Open a Visual Studio 2012 window. Create a test case and associate it with the bug.

Answer: C

Question No: 157 – (Topic 2)

You are a managing test cases by using Microsoft Test Manager (MTM). You create a new configuration.

You need to select the new configuration for all test cases in a test suite.

What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.)

  1. Select the new configuration as the default configuration for the test suite.

  2. Select the test suite and use Configurations to select the new configuration for the test suite.

  3. Select all of the test cases in the test suite and use Configurations to select the new configuration for the selected tests.

  4. Select the test suite and use Select test configurations for all tests to select the new configuration.

Answer: C,D

Question No: 158 DRAG DROP – (Topic 2)

Your team uses the Microsoft Visual Studio Scrum process template for a project. Your team uses the Area to filter by Function, with subcategories pertinent to those functions.

Your stakeholders want to be able to view requirements and quality reports by specific department.

You need to modify the Test Case Readiness report to add a filter so that the report can be filtered appropriately.

Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Explanation:

Ensurepass 2018 PDF and VCE

Create, customize, and manage reports for Visual Studio ALM

Question No: 159 – (Topic 2)

You are a test developer using Microsoft Test Manager (MTM).

You are developing a test case that must be run multiple times with different input values for a specific field each time. You have a list of values that will be used for the input.

You need to modify the test to enter each value into the field.

What should you do?

  1. Insert a parameter into the Action column of the test step and enter the input values into the Parameter Values pane.

  2. Insert a parameter into the Expected Results column of the test step and enter the input values into Parameter values pane.

  3. Insert a parameter into the Action column of the test step.

  4. Create test steps for each input value in the Action column.

Answer: A

Question No: 160 DRAG DROP – (Topic 2)

You are using Microsoft Test Manager (MTM) to manage your testing efforts. You need to produce a list of manual test runs over the past week.

What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Explanation:

Box 1: Navigate to the Analzse Test Runs view.

Box 2: In the View list, click Manual runs.

Box 3: In the Start data range list, click Last 7 days.

Note:

Select the Analyze Test Runs link and select the Show Manual Runs button to view the historical test runs for the current test plan. You may need to change the Start date range to All in order to see some test runs.

Ensurepass 2018 PDF and VCE

100% Ensurepass Free Download!
Download Free Demo:70-499 Demo PDF
100% Ensurepass Free Guaranteed!
70-499 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.